Crystal Palace, SE19

Crystal Palace, SE19 — Full Residential Refurbishment

A ground floor flat in Crystal Palace acquired in tired, dated condition and delivered to a high specification throughout.

The full scope of works included a complete strip out, new kitchen and bathroom, full rewire, new plumbing and heating system, plastering, flooring and full redecoration. Mid-project damp investigation revealed rising damp caused by the external ground level sitting above the damp proof course. Rather than a cosmetic fix — full remediation works were carried out, fully tanked, documented and certified with a 10 year insurance-backed guarantee.

The result — a fully transformed home delivered properly, with a clean structural survey on completion and a successful sale to a first-time buyer.

No shortcuts. No compromises. Just quality work done the right way.

Crystal Palace, SE19

Project Information

  • Project Location: Crystal Palace, SE19

  • Project Type: Residential Refurbishment

  • Photos: 14

Building Better Homes.

Go Back Top